Design & Built of 6 Villa Project

Client: PEO
Consultant: EHAF Engineering
Main Contractor: PAT ENGINEERING
Project Duration: March 2015 – September 2015
Project Location: Al Messila, Qatar
Scope of Work: Works include external works for the villa, consists of pavements and walkways within the boundary wall. Works also include underground works consist of all services (telephone, storm water, sewer, irrigation, potable water) works.

×