Client: Qatar Petroleum
Consultant: Parsons / Hyder
Main Contractor: Al Alia Trading & Contracting
Project Duration: September 11, 2012 – December 14, 2015
Project Location: Dukhan
Scope of Work: Infraworks (i.e. potable water, LV network, sewer system, irrigation systems) LV Cable Ducts: EN2 (2-Way Type)
Back of QNB, St. 451 Salwa Road, Bld 112, 1st Flr, Office 4
info@goldennails.qa
+974 3333 0516